Biogas cogeneration power plant in “Līgo”

CUSTOMER: z/s “Divjumi”
ADDRESS: “Līgo”, Lielplatones pag., Jelgavas nov.
DETAILS: 1 pc. fermenter Ø = 25,00 (m), H = 7,00 (m) with column in the middle
1 pc. storage tank Ø = 33,00 (m), H = 7,00 (m) with column in the middle
Technical building: control room 12,25 (m2) and technical room 64,40 (m2)
Raw material storage area 74,00 x 52,20 (m) with asphalt covering.

© 2016 “WOLF SYSTEM” SIA |  Latvija, Cesis, Ata Kronvalda 18 |  E-mail: info@wolfsystem.lv  |  Phone: +371 64120468  |  Fax: +371 64161170